System Design: Job order costing: Difference between revisions

From LinkedAUB Collab
Jump to navigation Jump to search
(Created page with "{{Topic |Learning Concepts=Absorption Costing, Allocation Base, Bill of Materials (BOM), Cost Driver, Cost of Goods Manufactured, Finished Goods, Job Cost Sheet, Job-order Cos...")
 
No edit summary
Line 1: Line 1:
{{Topic
{{Topic
|Learning Concepts=Absorption Costing, Allocation Base, Bill of Materials (BOM), Cost Driver, Cost of Goods Manufactured, Finished Goods, Job Cost Sheet, Job-order Costing, Materials Requisition Form, Multiple Predetermined Overhead Rates, Normal Cost System, Overapplied Overhead, Overhead Application, Plantwide Overhead Rate, Predetermined Overhead Rate, Raw Materials, Schedule of Cost of Goods Manufactured, Schedule of Cost of Goods Sold, Time Ticket, Underapplied Overhead, Work In Process
|Learning Concepts=Absorption Costing, Job-order Costing, Allocation Base, Bill of Materials (BOM), Cost Driver, Cost of Goods Manufactured, Finished Goods, Job Cost Sheet, Job-order Costing, Materials Requisition Form, Multiple Predetermined Overhead Rates, Normal Cost System, Overapplied Overhead, Overhead Application, Plantwide Overhead Rate, Predetermined Overhead Rate, Raw Materials, Schedule of Cost of Goods Manufactured, Schedule of Cost of Goods Sold, Time Ticket, Underapplied Overhead, Work In Process
}}
}}

Revision as of 19:51, 22 May 2014