Irani Oxy Engineering Building Construction: Difference between revisions

From LinkedAUB Collab
Jump to navigation Jump to search
(Created page with "{{Event |Name=Irani Oxy Engineering Building Construction |Location=Irani Oxy Engineering Building |Start Date/Time=2011/10/03 08:00 |End Date/Time=2013/10/07 00:00 |Event Typ...")
 
No edit summary
 
Line 1: Line 1:
{{Event
{{Event
|Name=Irani Oxy Engineering Building Construction
|Name=Irani Oxy Engineering Building Construction
|Location=Irani Oxy Engineering Building
|Location=Irani Oxy Engineering Complex
|Start Date/Time=2011/10/03 08:00
|Start Date/Time=03/10/2011
|End Date/Time=2013/10/07 00:00
|End Date/Time=2013/10/07 00:00
|Event Type=Construction
|Event Type=Construction
|Description=Designer & Consultant are “Nabil Gholam Architecture and Planning” (NGAP). The project is designed to comply with a Certification Level according to the U.S. Green Building Council's Leadership in Energy & Environmental Design (LEED) Rating System. Currently ongoing works are: Concrete pouring along foundation & vertical elements all along site, Slab on grade pouring in stages, Shuttering for first part of slab B1.  
|Description=Designer & Consultant are “Nabil Gholam Architecture and Planning” (NGAP). The project is designed to comply with a Certification Level according to the U.S. Green Building Council's Leadership in Energy & Environmental Design (LEED) Rating System. Currently ongoing works are: Concrete pouring along foundation & vertical elements all along site, Slab on grade pouring in stages, Shuttering for first part of slab B1.
}}
}}

Latest revision as of 14:54, 12 September 2013

Name

Irani Oxy Engineering Building Construction

Depiction

Depiction URL

Location

Irani Oxy Engineering Complex

Start Date/Time

03/10/2011

End Date/Time

2013/10/07 00:00

Event Type

Construction

Description

Designer & Consultant are “Nabil Gholam Architecture and Planning” (NGAP). The project is designed to comply with a Certification Level according to the U.S. Green Building Council's Leadership in Energy & Environmental Design (LEED) Rating System. Currently ongoing works are: Concrete pouring along foundation & vertical elements all along site, Slab on grade pouring in stages, Shuttering for first part of slab B1.