Irani Oxy Engineering Building Construction

From LinkedAUB Collab
Revision as of 14:54, 12 September 2013 by Fz13 (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Name

Irani Oxy Engineering Building Construction

Depiction

Depiction URL

Location

Irani Oxy Engineering Complex

Start Date/Time

03/10/2011

End Date/Time

2013/10/07 00:00

Event Type

Construction

Description

Designer & Consultant are “Nabil Gholam Architecture and Planning” (NGAP). The project is designed to comply with a Certification Level according to the U.S. Green Building Council's Leadership in Energy & Environmental Design (LEED) Rating System. Currently ongoing works are: Concrete pouring along foundation & vertical elements all along site, Slab on grade pouring in stages, Shuttering for first part of slab B1.