Mixed Costs

From LinkedAUB Collab
Revision as of 21:50, 28 May 2013 by Lah13 (talk | contribs) (Created page with "{{Learning concept |Description=A mixed cost contains both variable and fixed cost elements. Mixed costs are also known as semi-variable costs. }}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Description

A mixed cost contains both variable and fixed cost elements. Mixed costs are also known as semi-variable costs.

Concept Prerequisite

Wikipedia Reference

Learning Material

Covered in Topic(s)

 
Cost Terms Concepts and Classification