Multiple Predetermined Overhead Rates

From LinkedAUB Collab
Jump to navigation Jump to search

Description

A costing system with multiple overhead cost pools and a different predetermined overhead rate for each cost pool, rather than a single predetermined overhead rate for the entire company. Each production department may be treated as a separate overhead cost pool.

Concept Prerequisite

Wikipedia Reference

Learning Material

Covered in Topic(s)

 
System Design: Job order costing