Variable Overhead Efficiency Variance

From LinkedAUB Collab
Jump to navigation Jump to search

Description

The difference between the actual level of activity (direct labor-hours, machine-hours, or some other base) and the standard activity allowed, multiplied by the variable part of the predetermined overhead rate.

Concept Prerequisite

Wikipedia Reference

Learning Material

Covered in Topic(s)

 
Standard Costs and the Balanced Scorecard