Variable Overhead Rate Variance

From LinkedAUB Collab
Jump to navigation Jump to search

Description

The difference between the actual variable overhead cost incurred during a period and the standard cost that should have been incurred based on the actual activity of the period.

Concept Prerequisite

Wikipedia Reference

Learning Material

Covered in Topic(s)

 
Standard Costs and the Balanced Scorecard