Predetermined Overhead Rate: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

28 January 2014

  • curprev 13:2713:27, 28 January 2014Sfg02 talk contribs 377 bytes +377 Created page with "{{Learning concept |Description=A rate used to charge manufacturing overhead cost to jobs that is established in advance for each period. It is computed by dividing the estima..."