Activity Variance

From LinkedAUB Collab
Revision as of 17:21, 27 January 2014 by Sfg02 (talk | contribs) (Created page with "{{Learning concept |Description=The difference between a revenue or cost item in the static planning budget and the same item in the flexible budget. An activity variance is d...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Description

The difference between a revenue or cost item in the static planning budget and the same item in the flexible budget. An activity variance is due solely to the difference between the level of activity assumed in the planning budget and the actual level of activity used in the flexible budget.

Concept Prerequisite

Wikipedia Reference

Learning Material

Covered in Topic(s)

 
Flexible Budgets and Overhead Analysis