Variable Overhead Efficiency Variance

From LinkedAUB Collab
Revision as of 14:28, 29 January 2014 by Sfg02 (talk | contribs) (Created page with "{{Learning concept |Description=The difference between the actual level of activity (direct labor-hours, machine-hours, or some other base) and the standard activity allowed, ...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Description

The difference between the actual level of activity (direct labor-hours, machine-hours, or some other base) and the standard activity allowed, multiplied by the variable part of the predetermined overhead rate.

Concept Prerequisite

Wikipedia Reference

Learning Material

Covered in Topic(s)

 
Standard Costs and the Balanced Scorecard